Michigan NOF for Material Suppliers: What You Need to Know
If you supply lumber, plumbing fixtures, electrical materials, HVAC equipment, or any other materials to Michigan construction projects, your ability to pursue a lien may depend on serving a timely Notice of Furnishing. Many material suppliers assume the NOF rule only applies to subcontractors performing on-site labor — but that's incorrect.
Michigan's Construction Lien Act (Act 497 of 1980) treats material suppliers the same as subcontractors for NOF purposes. If you don't serve a Notice of Furnishing within 20 days of your first delivery, the scope or availability of a lien claim for unpaid materials may be affected.
Do Material Suppliers Need an NOF?
Yes. MCL 570.1109(1) expressly requires a "subcontractor or supplier" to serve a Notice of Furnishing within 20 days of first furnishing, and material suppliers are covered by that duty. (For reference, MCL 570.1103(5) defines "contractor" as a person contracting with the owner or lessee.) This means material suppliers must serve an NOF to meet statutory notice requirements relevant to a potential lien claim. This includes:
- Lumber yards and building material dealers
- Plumbing supply distributors
- Electrical supply houses
- HVAC equipment suppliers
- Roofing material suppliers
- Concrete and ready-mix suppliers
- Tool and equipment rental companies (for rental equipment used on site)
When Does the 20-Day Clock Start for Suppliers?
The 20-day clock starts on the first date of delivery — the day materials are physically delivered to the project site. This is not the date the purchase order was issued, the contract was signed, or materials were ordered. It's the date materials show up on site.
⚠️ If deliveries happen in phases, the first delivery date still triggers the 20-day NOF clock. You cannot wait and serve one NOF covering all deliveries later — by law, it's based on the earliest delivery.
What Your NOF Must Include as a Supplier
A Michigan NOF for a material supplier should include the same mandatory fields as any other NOF:
- Recipient: Name and address of the Designee (or owner if no designee)
- GC Copy: Name and address of the General Contractor
- Claimant: Your legal business name and address
- Contracting Party: The entity that ordered the materials (might be the GC or a sub)
- Description of Materials: Brief description of what you supplied (e.g., "Lumber and framing materials," "Plumbing fixtures and pipe")
- Property Description: Legal description or reference to the Notice of Commencement
- Statutory Warning: Required text in ALL CAPS per MCL 570.1109
Special Considerations for Material Suppliers
- Multiple delivery projects. If you make multiple deliveries to the same project, serve one NOF early (within 20 days of the first delivery) — it covers all future deliveries on that project.
- Off-site fabrication. Materials fabricated off-site but specifically for a project may count as "furnishing" depending on delivery terms. When in doubt, serve the NOF.
- Credit accounts. Having an open credit account with a contractor doesn't waive the NOF requirement. Serve an NOF on every project where materials go on site.
- Stop-delivery rights. A properly served NOF places the owner on notice about your furnishing; other remedies, including any ability to stop future deliveries, depend on the facts and applicable law.
Common Mistakes Suppliers Make
- Assuming "we're a supplier, not a contractor." Under Michigan law, you ARE a contractor for lien purposes — the definition covers material furnishers.
- Serving only the GC. The law requires the NOF to be served on the Designee (or owner), with a copy to the GC. Both are required.
- Using regular mail. Certified Mail is explicitly required under MCL 570.1109(1). First-class mail doesn't count.
- Waiting for payment problems. The NOF must be served proactively, within 20 days of the first delivery. You can't serve it retroactively when non-payment happens.
How Notice Track Helps Suppliers
Notice Track helps Michigan material suppliers prepare, send, and track an NOF. Enter your first delivery date, project details, and recipient information; the platform prepares the notice, mails it via USPS Certified Mail, and provides tracking and mailing records. No trip to the post office is required.
Related Michigan NOF Guides
Prepare your next NOF
Notice Track helps you prepare, send, and track your Michigan Notice of Furnishing, including Certified Mail delivery.
Get Started FreeNotice Track is a technology platform and does not provide legal advice. Documents, deadline calculations, and information on this site are for informational purposes only and do not create an attorney-client relationship. For advice specific to your situation, consult a licensed Michigan construction attorney. Read our full disclaimers.